All Results (4,062)

Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Aavid Mounting Fixings O-Ring, Viton (FKM) Material, Black, 75 Durometer Hardness 695Factory Stock Available
Min.: 1
Mult.: 1

Aavid Thermal Interface Products Thermalcote Thermally Loaded Silicone Based Grease, 28 Grams (1oz) Tube Drop Dispatch Lead Time 9 Weeks
Min.: 450
Mult.: 1

Aavid Thermal Interface Products Thermalcote Thermally Loaded Silicone Based Grease, 57 Grams (2oz) Tube Drop Dispatch Lead Time 8 Weeks
Min.: 250
Mult.: 1

Aavid Thermal Interface Products Thermalcote Thermally Loaded Silicone Based Grease, 0.45 kg (1 lb) Can Drop Dispatch Lead Time 8 Weeks
Min.: 50
Mult.: 1

Aavid Thermal Interface Products Thermalcote Thermally Loaded Silicone Based Grease, 2.27 kg (5 lb) Can Drop Dispatch Lead Time 8 Weeks
Min.: 20
Mult.: 1

Aavid Thermal Interface Products Thermalbond Hardener Epoxy, 25 gram Package Drop Dispatch Lead Time 12 Weeks
Min.: 30
Mult.: 30

Aavid Heat Sinks Extrusion, Flatback, Class A, 3.12mm W, 1.25mm L, 2.85 Degree C/W, 8 Foot Bar Drop Dispatch Lead Time 7 Weeks
Min.: 1
Mult.: 1

Aavid Heat Sinks Extrusion, Base 74765, 4.235mm W, 1.025mm L, 1.38 Degree C/W, 5 Foot Bar (60") Drop Dispatch Lead Time 10 Weeks
Min.: 2
Mult.: 2

Aavid Thermal Interface Products Thermalbond Hardener Epoxy, 3.5 oz Package Drop Dispatch Lead Time 18 Weeks
Min.: 50
Mult.: 50

Aavid Thermal Interface Products Thermalbond Hardener Epoxy, 4 lb Package Factory Drop Ship
Min.: 8
Mult.: 1

Aavid Recirculating Chillers Recirculating Chiller, 5900W, 10A, 1/2"FNPT, 6G, Pump: PDP, Brass, 4.3gpm, M126 Drop Dispatch Lead Time 14 Weeks
Min.: 1
Mult.: 1

Aavid Recirculating Chillers Recirculating Chiller, 5900W, 10A, 21.4x27.8x31.9", 1/2" FNPT, 6 Gallon, M127 Drop Dispatch Lead Time 18 Weeks
Min.: 1
Mult.: 1

Aavid 600651F00000G
Aavid Heat Sinks Extrusion, Base 60065, 9.25 Foot Bar (111 Inch) Drop Dispatch Lead Time 1 Week
Min.: 10
Mult.: 1

Aavid 605601F00000G
Aavid Heat Sinks Extrusion, Flatback, Class A, 4.375mm W, 1.29mm L, 1.91 Degree C/W, 8 Foot Bar Drop Dispatch Lead Time 12 Weeks
Min.: 1
Mult.: 1

Aavid 605951F00000G
Aavid Heat Sinks Extrusion, Flatback, Class A, 1.875mm W, 1mm L, 4.3 Degree C/W, 8 Foot Bar Drop Dispatch Lead Time 6 Weeks
Min.: 7
Mult.: 7

Aavid 609951F00000G
Aavid Heat Sinks Extrusion, Base 60995, 8 Foot Bar (96.5 Inch) Drop Dispatch Lead Time 5 Weeks
Min.: 9
Mult.: 9

Aavid 610501F00000G
Aavid Heat Sinks Extrusion, Base 60995, 8 Foot Bar (96.5 Inch) Drop Dispatch Lead Time 1 Week
Min.: 4
Mult.: 1

Aavid 610751F00000G
Aavid Heat Sinks Extrusion, Flatback, Class A, 4.5mm W, 1.4mm L, 1.9 Degree C/W, 8 Foot Bar Drop Dispatch Lead Time 12 Weeks
Min.: 1
Mult.: 1

Aavid 623251F00000G
Aavid Heat Sinks Extrusion, Flatback, Class C, 10.5mm W, 1.625mm L, 0.82 Degree C/W, 8 Foot Bar Drop Dispatch Lead Time 4 Weeks
Min.: 1
Mult.: 1

Aavid 626001F00000G
Aavid Heat Sinks Extrusion, Base 62600, 2.872mm W, 1.312mm L, 2.7 Degree C/W, 8 Foot Bar (96.5") Drop Dispatch Lead Time 7 Weeks
Min.: 4
Mult.: 1

Aavid 630051F00000G
Aavid Heat Sinks Extrusion, Class C, 63005, 2.1mm W, 1.25mm L, 3.93 Degree C/W, 8 Foot Bar Drop Dispatch Lead Time 3 Weeks
Min.: 1
Mult.: 1

Aavid 633401F00000G
Aavid Heat Sinks Extrusion, Base 63340, 17mm W, 1.312mm L, 0.49 Degree C/W, 6 Foot Bar (72") Drop Dispatch Lead Time 5 Weeks
Min.: 1
Mult.: 1

Aavid 675901F00000G
Aavid Heat Sinks Extrusion, Flatback, Class C, 3.45mm W, 1.23mm L, 1.58 Degree C/W, 8 Foot Bar Drop Dispatch Lead Time 10 Weeks
Min.: 1
Mult.: 1

Aavid 717701F00000G
Aavid Heat Sinks Extrusion, Base 60995, 8 Foot Bar (96.5 Inch) Drop Dispatch Lead Time 1 Week
Min.: 29
Mult.: 1

Aavid 790001F00000G
Aavid Heat Sinks Extrusion, High Fin Density, Class C, 2.62mm W, 2.7mm L, 1.59 C/W, 8 Foot Bar Drop Dispatch Lead Time 11 Weeks
Min.: 6
Mult.: 1