All Results (1,570)

Select a category below to see filtering options and narrow down your search.
Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, neg-enable, 36-160Vdc in, 15V 10A out 58.4 x 37.3 x 17mm Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, neg-enable, 36-160Vdc in, 15V 10A out 58.4 x 37.3 x 17mm, 1" heatsink added Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, 36-160Vdc in, 12V 12A out 58.4 x 37.3 x 17mm Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, 36-160Vdc in, 12V 12A out 58.4 x 37.3 x 17mm, 1" heatsink added Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, neg-enable, 36-160Vdc in, 12V 12A out 58.4 x 37.3 x 17mm Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, neg-enable, 36-160Vdc in, 12V 12A out 58.4 x 37.3 x 17mm, 1" heatsink added Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 75W 66-160Vin 5V 15A Non-Stocked Lead-Time 14 Weeks
Min.: 140
Mult.: 140

Advanced Energy / Artesyn DC/DC Converters - Through Hole 75W 66-160Vin 5V 15A w/ Heatsink Non-Stocked Lead-Time 14 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 75W 43-101Vin 5V 15A Non-Stocked Lead-Time 14 Weeks
Min.: 140
Mult.: 140

Advanced Energy / Artesyn DC/DC Converters - Through Hole 75W 43-101Vin 5V 15A w/ Heatsink Non-Stocked Lead-Time 14 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 100W 1/4 brick, 36-160Vdc in, 5V, 20A out 58.4 x 37.3 x 17mm Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 100W 1/4 brick, 36-160Vdc in, 5V, 20A out 58.4 x 37.3 x 17mm, 1" heatsink added Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 100W 1/4 brick, neg-enable, 36-160Vdc in, 5V, 20A out 58.4 x 37.3 x 17mm Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 100W 1/4 brick, neg-enable, 36-160Vdc in, 5V, 20A out 58.4 x 37.3 x 17mm, 1" heatsink added Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, 36-160Vdc in, 5V, 30A out 58.4 x 37.3 x 17mm Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, 36-160Vdc in, 5V, 30A out 58.4 x 37.3 x 17mm, 1" heatsink added Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, neg-enable, 36-160Vdc in, 5V, 30A out 58.4 x 37.3 x 17mm Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn DC/DC Converters - Through Hole 150W 1/4 brick, neg-enable, 36-160Vdc in, 5V, 30A out 58.4 x 37.3 x 17mm, 1" heatsink added Non-Stocked Lead-Time 34 Weeks
Min.: 120
Mult.: 120

Advanced Energy / Artesyn Modular Power Supplies - Chassis Bulk Power; AC-DC 3-PH, 10KW; 48V; Terminal Block Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1

Advanced Energy / Artesyn Power Supplies - Rack Mount 3000 - 18,000 W 19" Rack; 3-phase Input (For HPS3KW ONLY) Non-Stocked
Min.: 1
Mult.: 1
Advanced Energy / Artesyn Power Supplies - Rack Mount 3000 W 48V Module 1U Non-Stocked Lead-Time 16 Weeks
Min.: 50
Mult.: 50

Advanced Energy / Artesyn Modular Power Supplies - Assembled 19 in 12KW Case High Line 3-Phase Air Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1

Advanced Energy / Artesyn Modular Power Supplies - Assembled 19 in 24KW Case High Line 3-Phase Air Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1

Advanced Energy / Artesyn Modular Power Supplies - Assembled 19 in 24KW Case Low Line 3-Phase Air Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1

Advanced Energy / Artesyn Modular Power Supplies - Assembled Non-Stocked
Min.: 1
Mult.: 1